Day 1

When we arrived at the house after completion day we found that all the previous owners belongings were still inside so the first job was to clear it. We started this yesterday afternoon and got all the furniture, carpets cupboards etc into the lounge and garage ready for a skip to be delivered first thing today at 7:30am. Hopefully we will get most of it in the skip and then start taking the kitchen and bathroom suite apart and get the tiles off the walls. Here are some pictures taken before we started:
property%20from%20outside%20before%20refurb1

main%20bedroom%20before%20renovation1

living%20room%20before%20renovation1

hallway%20before%20refurbishment1

garden%20before%20works%20started1

These pictures were taken while we were clearing the house. It took 3 skips in the end and we still have some rocks and overgrown bushes left in the front garden. We will also have to remove a ton or so of shingle and earth from the backgarden before we can grade it and turf it.
main%20bedroom%20cleared1

garage%20before%20renovation1

garden%20from%20backdoor%20before%20makeover1

living%20room%20windowsill%20from%20outside%20before%20renovation1

kitchen%20being%20cleared%20before%20renovation1

lounge%20cleared%20of%20furniture1

lounge%20with%20a%20skip%20full%20of%20rubbish%20from%20the%20rest%20of%20the%20house1
Now the house has been reduced to a bare shell we can start to plan out where things are going. The boiler was previously updated and moved to the small bedroom. We are going to move it back into the kitchen. The electrics are currently on one ring. We have started to re-wire into separate rings. Also the garage has been electrified at some time as a spur from the lounge feed and then spurred again for the lights which we will remove and run a sub-main with its own consumer unit and RCD (Residual Current Device). The fuseboard has no RCD and will be replaced with a new Consumer Unit with RCD’s and MCB’s (Miniature Circuit Breakers).

Here is a picture of the kitchen design that we have drawn up. We have had to place the units based around where certain items are or will be situated such as the boiler, soil pipe, and radiator. The kitchen is 3.1m in length and 2m wide.
3d%20kitchen%20model%20of%20planned%20layout1

Most of the channelling and knocking out for the twin and earth and back boxes has now been done in the kitchen. The garden has been completely cleared of rubbish and all the over grown bushes have been removed ready for grading.
kitchen%20electrics%20channelled%20out1

This is the bathroom ripped out ready for the new plumbing and electrics t be put in before the tiling and bathroom suite is fitted.
bathroom%20stripped%20out1

Lounge now clear and ready for floor to be taken up and new electrics installed.
lounge%20before%20works1

Here is the garden clearance well under way.
garden%20being%20cleared1

garden%20before%20excavation1

This is most (but not all!) of the rocks that were removed from the front garden.
most%20of%20the%20rocks%20removed%20from%20the%20front%20garden1

These roots were all removed from the clay pipe storm drains (remnants of pipes in bottom left hand corner of photo) which had to be dug out and replaced.
roots%20removed%20from%20storm%20drains1

Part of the new storm drains.
storm%20drain%20dug%20out%20and%20fixed1

garden%20cleared%20and%20excavated1

The front and back garden has been totally cleared and we have had a digger in to grade the ground before we add topsoil and turf. Also today we have the plasterers in doing all the ceilings and walls and a roofer to fix some broken broken tiles on the garage roof and to re-do the flashing.
digger%20grading%20front%20garden1

digger%20grading%20back%20garden1

plastering%20begins1

Snow and ice stops everybody getting in on Friday, more snow on Saturday. Looks like we’ve shutdown for Xmas!
snow%20stops%20work%20in%20devon1

more%20snow1

The carpenter managed to get in yesterday and installed the garage window frame that he had made up for us along with the door frame and door. The door frame came from Magnets and the door came from B&Q. It has double glazed panes which is a bit of overkill for the garage but it will match as we have ordered the same door for the living room back door.
garage%20window%20frame1

garage%20door%20and%20window%20frame1

The window company managed to get out of Torquay despite the well below zero conditions and fit the new PVCu windows today. Also we have started fitting the new skirting boards and architrave and treated the new wooden garage back door and window to protect them from the elements while we are away over the festive season.
new%20kitchen%20upvc%20window1

new%20front%20upvc%20windows1

new%20rear%20window%20from%20garden1

new%20rear%20window%20from%20lounge1

garage%20door%20after%20treatment1

Now we are back in full swing after the festive break. The carpenter is in in at the moment hanging the front door. Below are some pictures of the door being offered up on tapered wedges ready to be planed to size. Then there are some pictures of the rebate at the bottom of the door being chopped out with a router. Then finally the hinges and locks being scribed and chopped out with a chisel. It was dark by the time the door was hung so I’ll put some pictures up of the finished job today.
front%20door%20on%20tapers%20being%20fitted1

mitre%20being%20used%20to%20scrub%20housings%20for%20hinges%20prior%20to%20being%20cutout1

hinges%20being%20chiselled%20out1

front%20door%20hinges%20being%20fitted1

beginning%20to%20rout%20rebate%20on%20front%20door1

routing%20out%20rebate%20on%20front%20door1

routing%20out%20rebate%20for%20front%20door%20threshold1

This week the carpenter has finished off the architrave and skirting. All the electrics are now wired so we have replaced the floor boards and made good where we had to chop boards out to run cables. The boiler has now been moved back into the kitchen and is now fully functional so everyone’s happy now that we have the heating on. We have started prepping the walls where conduit has been run and holes have been made etc ready for painting.
new%20front%20door%20installed1

This week we have spent prepping and painting the walls in the kitchen and bathroom. The kitchen has now been painted with a couple of coats of primer and four coats of Vinyl Matt Magnolia on the walls and Matt White on all the ceilings plus undercoat on all the skirtings and architrave.

The carpenter has completed the fitting of all the internal and external doors and door furniture. The three external doors have been treated with a clear wood stain and the internal doors have been primed with undercoat.

The outside decorating contractors have performed the first stage of their prep taking down all the unwanted fixtures like satellite dishes and aerials which are no longer used. These holes have then been filled up along with the old boiler pipe holes. They have painted the soffits, barge boards and front door frame and undercoated the up and over garage doors and made good where the new window and door was put in the garage. They will return to spray with anti-fungicidal treatment, smooth off any holes which have sunk in and re-bracket the guttering where the fixings have broken or been removed before giving all the render two coats of paint.

Yesterday we tiled and grouted the kitchen floor with a black slate tile.
kitchen%20tiles%20laid%20and%20grouted1

The kitchen units have now been fitted all bar the wall units. The Kick boards (plynths) and some of the doors have yet to be fitted and the cut outs for the hob and sink in the counter-tops will be jig sawed out next week.

The bath has been set up and fixed to the floor and wall and a frame has been put round it ready for the plywood to take the tile. The floor has been tiled with the same slate tiles as the kitchen.

All the walls have been prepped and the bedrooms have been primed and painted with matt magnolia on the walls and matt white on the ceilings and the skirting boards and architrave glossed white.
kitchen%20units%20and%20countertops%20installed1

kitchen%20units%20going%20in1

bath%20and%20frame%20installed1

The tiling in the kitchen is now complete and the cooker, hob, cooker hood and sink are in. The taps need to be fitted which needs some cutting around of the panel behind the sink unit. The thermostatic controller for the boiler can now be fitted along with the rest of the electrics in the kitchen. It just remains for the radiator to be painted and the walls finished off around the tiling and new taps fitted for the washing machine along with cutting the access holes in the wall panel. The pull handles also need to be fitted to the doors and drawers.

The bathroom just needs a couple of tiles where the hot and cold feeds and waste pipe extend out from under the bath but this cannot be done until the sink is in. Some remedial work, to allow the tiles to sit flat and perpendicular to the wall, needs to be performed around the window where the double glazing fitters cemented a bar which protrudes out beyond the aperture of the window.

Work has now been completed on the outside walls of the house. The guttering has been re-routed at the back of the house to accommodate the back garage door and a third coat of exterior paint has been applied on the render and second coat on the garage doors. The rest of the internal walls in the house are being prepped and painted and work has started in the garden to remove the old shared fence and replace with feathered edge.
kitchen%20splashback%20tiled1

bathroom%20tiling%20on%20side%20wall1

bathroom%20tiling%20around%20wc1

towel%20radiator%20installed%20and%20tiled%20around1

The basin has been installed and plumbed in the bathroom with a splash-back matching the rest of the tile. The tiling has been finished around the sides of the bath and the water feed and waste pipes and the bath panel has been cut and fitted. Anti bacterial caulking has been applied around the bath (when filled with water) and the basin and around the ceiling. Remedial work has been carried out around the inside of the bathroom window. There is some making good to do for the grouting and around the walls and the shower head to fix up along with the shower screen, which will finish off the bathroom work, all slated for Tuesday of next week.

The finishing touches have been applied to the outside of the building fabric with just the turfing, fencing and threshold construction to complete.

Carpenter Tony Dumbarton has been on-site finishing off dry lining, door drip caps and skirting boards in the cupboards where brickwork had been exposed and pipe work had been re-routed.

The exterior render has been finished and also all the making good on the inside has been completed.
exterior%20render%20patched%20and%20painted1

second%20bedroom%20cupboard%20dry%20lined%20and%20plastered1

The bathroom is now finished. The kitchen is almost complete. Just waiting for the consumer unit to be moved which is scheduled for next Thursday. Then the last wall unit can go up.
Work is busy around the house painting the walls, skirtings and architraves. There is also activity outside removing an old boundary wall and concrete fence posts ready for the new fence and top soil to level the garden up.
finished%20bathroom%20looking%20at%20basin%20from%20landing1

finished%20bathroom%20looking%20at%20wc%20from%20landing1

Holes for the fence posts have been dug out, concrete gravel boards put down and the 6 foot feathered edge panels have been mounted in between the posts in the back garden. The first part of the back step has been constructed.
new%20fence%20in%20back%20garden1

new%20step%20constructed1
4 tonnes of top soil have gone down mostly in the back garden to level the ground and make sure the turf falls slightly away from the house. Then the turf has been laid and edged with plumb slate stone. Now we just have to keep it well watered for the next couple of weeks.

back%20garden%20turfed%20looking%20from%20back%20fence1

back%20garden%20turfed%20looking%20from%20garage1

back%20garden%20turfed%20looking%20from%20main%20bedroom%20window1

front%20garden%20turfed1

The house has now been carpeted through out in a lovely warm oatmeal carpet and adds the finishing touch to the interior.
new%20carpets%20laid%20through%20out1

The refurbishment works are now all complete and the property looks like a show home. Now we wait for the valuations from the estate agents.
completed%20kitchen%20looking%20at%20tall%20broom%20cupboard%20from%20hallway1

completed%20kitchen%20looking%20at%20sink%20from%20hallway1

complteted%20kitchen%20looking%20at%20worktops%20from%20stairs1

completed%20stairs%20looking%20from%20hallway1

completed%20stairs%20looking%20from%20bottom%20step1

completed%20stairs%20looking%20from%20top%20step1

completed%20main%20bedroom1


To have an article featured, email:
editorial@propertyauctionaction.co.uk

To advertise, contact:
advertising@propertyauctionaction.co.uk


You may also like these articles...

Garden lights installed into decking and sleeper wall

Add garden lights to your patio

With the patio construction pretty much complete and now laid in the 3 major zones around the perimeter of the house (garage, kitchen/dining room, side return) it's now time to ...
Read More
Grouting patio joints

Enhance your property by laying a new patio – part #6

One thing you don’t want when you’ve just grouted your patio is to have torrential rain in the next 24 hours which is exactly what we got. The grout had ...
Read More
Slabs laid ready for grouting

Enhance your property by laying a new patio – part #5

With the ground levelled, falls going the right way around the property and the MoT type 1 spread over and compacted with a petrol plate the slab laying is now ...
Read More
Slate Tiles

Enhance your property by laying a new patio – part #4

With most of the below ground works finished it’s now time to start building the ground back up. A green led laser level (more easily seen in daylight) was used ...
Read More
New drainage pipe for channel drain

Enhance your property by laying a new patio – part #3

Round by the garage and the back door of the property the wall of the garage is built into the bank of the house next door. The gravel boards of ...
Read More
subbase collapse under patio

Enhance your property by laying a new patio – part #2

This is part 2 of the patio replacement project which we are starting for the summer. We have pulled up the old patio slabs revealing the thin sand base layer ...
Read More
Old uneven patio

Enhance your property by laying a new patio – part #1

Now that the summer is fast approaching it is time to start thinking about your outside spaces. This patio is twenty years old and is beginning to show its age ...
Read More
Repair broken roof tile and rotten fasci and box end

Roof Repair Case Study – Broken Roof Tile and Rotten Fascia

Roof Repair - Broken roof tile leading to a rotten fascia and box end One of the roof the tiles was cracked all the way down the centre of the ...
Read More
Loading...