Old uneven patio

Enhance your property by laying a new patio – part #1

Old uneven patio

Now that the summer is fast approaching it is time to start thinking about your outside spaces. This patio is twenty years old and is beginning to show its age. The patio slabs have sunken in places and have become uneven in high traffic areas. It’s time to pull up the old pavers and lay down a new patio.

When the original house builders laid the patio they put down a very thin sub base of hardcore and then laid a thin layer of sand on top without compacting the earth underneath. This has led to the slabs sinking and becoming uneven in places. See the picture below.

Enhance your property by laying a new patio - part #1 Property Auctions UK

The first part of the project is to pull the slabs up and prepare the groundwork. This will involve taking off the old sand base layer and digging out the hardcore sub base and some of the earth below that to give enough depth for the sub base, base and slab layers. This will allow for a new sub base of 100mm of sub base Type 1 MoT. MoT stands for Ministry of Transport which is the specification for the type of hardcore used for sub base layers also known as DoT or Department of Transport. On top of the Type 1 will go a base layer of cement to a depth of 40mm. The base layer will be made up of 3 parts sharp sand and one part cement with the slabs being laid on top of the base layer. The depth of the slab should be taken into account as well to allow for a gap of 50mm if possible below the level of the damp proof course (DPC) so that the risk of water penetration into the brickwork from the splash back of droplets against the wall when it rains is minimised.


To have an article featured, email:
editorial@propertyauctionaction.co.uk

To advertise, contact:
advertising@propertyauctionaction.co.uk


You may also like these articles...

subbase collapse under patio

Enhance your property by laying a new patio – part #2

This is part 2 of the patio replacement project which we are starting for the summer. We have pulled up the old patio slabs revealing the thin sand base layer ...
Read More
Old uneven patio

Enhance your property by laying a new patio – part #1

Now that the summer is fast approaching it is time to start thinking about your outside spaces. This patio is twenty years old and is beginning to show its age ...
Read More
Repair broken roof tile and rotten fasci and box end

Roof Repair Case Study – Broken Roof Tile and Rotten Fascia

Roof Repair - Broken roof tile leading to a rotten fascia and box end One of the roof the tiles was cracked all the way down the centre of the ...
Read More

Renovate your favourite old chair

Do you have a favourite leather or vinyl sofa in your house or perhaps chairs at your office or in a salon that are beginning to show their age or ...
Read More
Finally The Engineered Oak Floor Is Complete

Make Your House Entrance Hall Pop With An Engineered Oak Wood Floor

The entrance hall is the first thing that everyone sees when they step into to your property. One of the easiest ways to give your house an upgraded hallway is ...
Read More
Using chemical to fixings in thermalite blocks

Fixing to Breeze Blocks Using Chemical Fixings

Breeze blocks like Thermalite or Celcon are used a lot in the property industry for their ease of use and green credentials. We had a requirement to fix some wall ...
Read More
Door with completed replacement Multipoint Lock

Replacing a Multipoint Lock System in a uPVC Door

The deadlock in this uPVC door failed so it was time to replace it with a new one. For the most part their are a couple of variants for the ...
Read More
Corner sink basin

Cloak-room makeover

This cloak-room has remained the same since the house was built in 2000. It was uninspiring then with all the inlet and waste pipes unflatteringly on display below the wall ...
Read More
Loading...