New drainage pipe for channel drain

Enhance your property by laying a new patio – part #3

New drainage pipe for channel drain

Round by the garage and the back door of the property the wall of the garage is built into the bank of the house next door. The gravel boards of the boundary fence also act as a retaining wall holding the earth back. Rainwater runoff from higher up the road runs into the patio area of the house and makes the external walls wet when it rains hard. There is a Damp Proof Course (DPC) which prevents water penetrating internally.

To alleviate the effects of the surface rainwater run off a channel drain will be installed against the kitchen wall and continued round at the bottom of the patio running parallel with a new retaining wall which will hold back the earth from the garden. The retaining wall is made of new sleepers of lengths 1.2 metres and 1.8 metres and widths 100mm x 150mm. A narrow trench was dug and filled with type 1 with a sand and cement base that the first lot of sleepers were laid on with haunching (cement support) applied to the back of the sleeper wall once the wall was finished.

Enhance your property by laying a new patio - part #3 Property Auctions UK
Type 1 and cement base for sleeper wall

The sleepers were staggered to match the height of the earth that would be retained behind the wall. They were cut and offered up dry to start with to make sure they fitted together properly. Holes were drilled in the sleepers to accept 1.2 metre long 20mm steel rods which were passed through the sleepers and hammered into the ground with 2 part polyester resin being used to glue the rods inside the sleepers. The sleepers were also glued in place with a quick setting Silyl Modified Polymer glue.

Enhance your property by laying a new patio - part #3 Property Auctions UK
Sleeper wall partially built

Once the wall was complete it was left for 24 hours to allow the adhesives to set properly.

Enhance your property by laying a new patio - part #3 Property Auctions UK
Sleeper wall finished

The rainwater which comes off the garage roof is carried away by a gutter into a downpipe. An inspection pit was dug following the line of the downpipe from the gutter in order to trace where the water was draining to.

Enhance your property by laying a new patio - part #3 Property Auctions UK
Inspection pit to reveal drainage pipe leading to soakaway. Main main foul water sewer pipe routed above.

The downpipe exited into a 110mm 90 degree bend by means of a flexible reducer pushed over the pvc pipe. The inspection pit revealed that the pipe went under the shared services foul water drainage pipe and continued into a soakaway. A trench was dug to run the pipe which would be teed off and run up to the channel drain.

Enhance your property by laying a new patio - part #3 Property Auctions UK
Inspection pit to reveal drainage pipe leading to soakaway. Main main foul water sewer pipe routed above.

In order to carry away the water from the new channel drain it was proposed that the rainwater drainage pipe for the garage roof gutter would have a tee placed into it and a new trench would be dug for a pipe to be laid and run upto a P trap. The use of a P trap was just to stop any possible gases coming up from the soakaway and exiting into the atmosphere at ground level through the channel drain. The P trap would have a downpipe that joans the bottom of the corner joint of the channel drain. Here the pipe is cut to accept the slip coupling and double socket branch.

Enhance your property by laying a new patio - part #3 Property Auctions UK
Pipe cut ready to fit slip coupling

Then the slip coupling is inserted with pipe lubricant …

Enhance your property by laying a new patio - part #3 Property Auctions UK
Fitting slip coupling with joint lubricant to aid movement of coupling up and down pipe.

… and the double socket branch is inserted into the pipe.

Enhance your property by laying a new patio - part #3 Property Auctions UK
Double socket branch tee fitted to facilitate installation of drainage pipe to channel drain.

Then a piece of straight pipe was inserted into the double socket outlet and 90 degree adjustable double socket bend was inserted into that which allowed a long piece of pipe to be run upto a 15 degree bend and into the P trap. The P trap was placed on type 1 and then a piece of broken patio slab to give a firm base. Once the P trap outlet was judged to be in the correct place to accept the channel drain outlet 10mm pea shingle gravel was shovelled into the trench to backfill the space around the pipes.

Enhance your property by laying a new patio - part #3 Property Auctions UK
Trench backfilled with 10mm gravel pea shingle

To have an article featured, email:
editorial@propertyauctionaction.co.uk

To advertise, contact:
advertising@propertyauctionaction.co.uk


You may also like these articles...

New drainage pipe for channel drain

Enhance your property by laying a new patio – part #3

Round by the garage and the back door of the property the wall of the garage is built into the bank of the house next door. The gravel boards of ...
Read More
subbase collapse under patio

Enhance your property by laying a new patio – part #2

This is part 2 of the patio replacement project which we are starting for the summer. We have pulled up the old patio slabs revealing the thin sand base layer ...
Read More
Old uneven patio

Enhance your property by laying a new patio – part #1

Now that the summer is fast approaching it is time to start thinking about your outside spaces. This patio is twenty years old and is beginning to show its age ...
Read More
Repair broken roof tile and rotten fasci and box end

Roof Repair Case Study – Broken Roof Tile and Rotten Fascia

Roof Repair - Broken roof tile leading to a rotten fascia and box end One of the roof the tiles was cracked all the way down the centre of the ...
Read More

Renovate your favourite old chair

Do you have a favourite leather or vinyl sofa in your house or perhaps chairs at your office or in a salon that are beginning to show their age or ...
Read More
Finally The Engineered Oak Floor Is Complete

Make Your House Entrance Hall Pop With An Engineered Oak Wood Floor

The entrance hall is the first thing that everyone sees when they step into to your property. One of the easiest ways to give your house an upgraded hallway is ...
Read More
Using chemical to fixings in thermalite blocks

Fixing to Breeze Blocks Using Chemical Fixings

Breeze blocks like Thermalite or Celcon are used a lot in the property industry for their ease of use and green credentials. We had a requirement to fix some wall ...
Read More
Door with completed replacement Multipoint Lock

Replacing a Multipoint Lock System in a uPVC Door

The deadlock in this uPVC door failed so it was time to replace it with a new one. For the most part their are a couple of variants for the ...
Read More
Loading...