Convert your shady bare slope into a beautiful rockery

Finished Alpine Rockery

Do you have a bare slope on your property that is hidden by trees and partly in the shade. If so then you probably find its difficult to get plants to grow especially if you have trees growing on the slope.

Trees tend to drink a lot of water so any plants that are growing in and around them have to fight for the nutrients and the light that they need. The ground tends to become very hard and compact and the only things that seem to thrive in this environment are the weeds.

It can be really frustrating trying to maintain such a piece of ground so that it looks good all year round and doesn’t need constant attention.

We had a project to landscape just this sort of area and decided that a rockery was the ideal solution. We could infill the stones with alpine plants that would add all year-round interest to the space but wouldn’t need a huge amount of tender loving care in order to thrive.

The first stage of the project was to calculate how much material was required and place an order with the suppliers. The slope in question is approximately 25 square metres. Using an online aggregate estimation tool and adding a reasonable amount on for good measure I calculated that we would need around 3 tonnes of 40 millimetre slate chippings to cover the entire area. The supplier we used delivered the chipping in 3 formats, loose, palletised in one giant bag or in small 20 kilogramme bags also on a pallet. From personal experience it’s much easier humping aggregate when it’s delivered in small bags and can be easily lifted and wheel barrowed to its required destination. Shovelling loose slate from a pile into a barrow is back breaking work. In this instance we ordered 3 tonne of the large bulk bag as this was a bit cheaper than the multibag option.

Chippings shovelled into trugs
Chippings shovelled into trugs

No rockery would be complete without the large rockery stones themselves. The supplier that I was using for the slate chippings also did a 1 tonne caged pallet of large grey slate rockery stones. The order was placed and delivery set for 2 days from the date of the order.

For the retaining edging I decided to do it in treated 19 x 150 timber. A breathable and permeable membrane would be laid to help prevent weeds from growing. Because the slope is quite severe in places, I decided that in order to prevent the large rockery stones from rolling down the slope after they were placed in position that I would drill a hole in some stones and insert steel round bar which would be driven into the ground and hold the stone in place. The round bar I sourced as a 6 millimetre chromed threaded bar at a reasonable price from a well know trade counter along with a diamond tipped drill to put the holes in the stones. I also placed some of the 18 x 150 timber strategically along the slope to give the stones some support in particularly steep areas. 

The first job was to clear any existing weeds from the slope and then roughly place some of the large stones to get an idea of how they would look and make sure that the 1 tonne of stone was evenly distributed.

Roughly laying out rocks
Roughly laying out rocks

The next job was to cut and lay the membrane. Use a few stones to hold the membrane down or some long pins that can be purchased online.

Cutting membrane to fit slope
Cutting membrane to fit slope

Then it was time to start placing the large stones permanently. Any that were in a precarious position on the slope I drilled a hole in the bottom and inserted the round bar.

Diamond tipped drill being used to put hole in rock
Diamond tipped drill being used to put hole in rock

The round bar was then driven into the ground to support the stone and stop it running way down the slope. Other stones were then placed around the supported one to create a clump of stones.  

Round bar inserted into rock
Round bar inserted into rock
Rock placed with stabilising round bar driven into the ground
Rock placed with stabilising round bar driven into the ground

Once all the large stones were in place it was time to start spreading the chippings around. I started from the bottom up so that the chippings were supporting each other as they were applied further up the slope.

Chippings piled onto boards and shovelled onto final destination
Chippings piled onto boards and shovelled onto final destination

We also had some chippings that we had collected from clearing another project but these chippings had been laid for quite some time and were covered in earth, mulch and roots from other plants so we used an electric sieve to wash them down in order to prepare them for putting on the rockery. I

Sieve used to wash chippings
Sieve used to wash chippings

Once all the chippings had been spread over the slope we washed them down to get rid of the slurry that is made during manufacture.

The final stage was to insert some alpine plants into the crevices of the stones, we chose alpines that flowered at different times to give year round appeal with a mixture of different coloured flowers and bright green foliage to add contrast and made sure they were ideal for shady or partly shaded locations.

Rockery after stones have been washed
Rockery after stones have been washed


To have an article featured, email:
editorial@propertyauctionaction.co.uk

To advertise, contact:
advertising@propertyauctionaction.co.uk


You may also like these articles...

Finished wetroom

Refurbishment Case Study – Ensuite makeover, creating a Wet Room

Project details Developer – Managed project Property detail – Residential Project detail – Conversion of En-Suite into a Wet Room Location – Hertfordshire Duration – 6 Weeks Overview Here are the details ...
Read More
New trees two years on

Landscaping Case Study – Planting Trees in Back Garden

Just finished a project to plant four Extra-Heavy Standard trees to act as a screen in a back garden. The trees chosen to plant were 2 Red Rob (Photinia) and ...
Read More
Beaumatic hob installed

DIY Case Study – Problem fitting Baumatic Ceramic Hob

Just fitted a new Baumatic ceramic hob in a kitchen we were renovating. The fitting instructions give the cutout dimensions which do not take into account the screws sticking out ...
Read More
Exterior rendering

Refurbishment Case Study – Diary of a property renovator

Project details Developer - Owner-managed project Property Detail - Semi-Detached House Location - Barnstaple Duration - 4 Months Day 1 When we arrived at the house after completion day we found ...
Read More
Barn at potential development site at Keith, Banffshire

Site alert – Possible development site near Keith, Banffshire

Went to a possible development site today near Keith in Banffshire. The site consists of 3 plots. A farmhouse and 2 steadings. There is existing planning permission to convert to ...
Read More