Refurbishment Case Study – Ensuite makeover, creating a Wet Room

Finished wetroom viewed from WC

Project details

  • Developer – Managed project
  • Property detail – Residential
  • Project detail – Conversion of En-Suite into a Wet Room
  • Location – Hertfordshire
  • Duration – 6 Weeks

Overview

Here are the details for a wetroom we have just completed. The old ensuite was in need of a makeover. The shower cubicle was falling apart and there was water ingress between the tile and the dry lining causing mold issues. The thermostatic shower valve had started to give up the ghost and the shower head had split both because of calcium build-up and corrosion.